|

by Noah Robertson and Dan Diamond
August 23, 2026
from
TheWashingtonPost Website
Article also
HERE
|
Noah Robertson
joined the Washington Post in
2025, where he covers the core national security committees in
Congress. He previously covered the Pentagon and American politics
from gun control to policing.
Dan Diamond
is a White House reporter for
The Washington Post, with a focus on policy, public health and
President Trump's transformation of Washington. His email is
dan.diamond@washpost.com and you can reach him on Signal at
@dan_diamond.01. |

President Donald Trump
talks to
reporters about his
proposed
ballroom on May 19.
(Chip
Somodevilla/Getty Images)
The
White House already has
a
nuclear-proof facility
buried
deep underground
and built
in secret after 9/11...
President
Donald Trump
has claimed that the White House needs a massive new
ballroom because it would provide him and future presidents with a
secure, hardened facility.
But former officials say the argument fails to
acknowledge that the presidential complex already has one.
More than a decade ago, federal officials built a highly protected
bunker, embedded deep underground, that can shelter the president
and his top aides in a national security emergency, according to
three former officials.
The facility, which was secretly completed during the
Obama administration, can house
dozens of people for up to multiple weeks, two former officials
said.
It's buried more than 60 feet underneath the
White House complex and built to withstand a nuclear blast,
two of the officials said, ensuring the president and his team have
a secure command center to run the country in times of extreme
duress.
The bunker's existence, the former officials
said, undercuts the Trump administration's emerging legal argument
in the ongoing lawsuit over the
$600 million ballroom complex's
construction: that the facility must be completed due to its
significance for U.S. national security.
The people spoke on the condition of anonymity to discuss elements
of the secretive facility, some of which have not been previously
reported.
The Washington Post is withholding some details of the bunker
and its construction in order to not compromise sensitive White
House security protocols.
Asked about Trump's assertions about the need for a new military
complex, the White House defended the project and criticized past
officials for discussing existing security structures.
"The East Wing Modernization Project is
inextricably tied to the security of the President, the White
House grounds and the certain security infrastructure assets,"
said White House spokesman Davis Ingle in a statement.
"Recent events such as the foiled attack on
the historic UFC Freedom 250 event at the White House proves
exactly why the East Wing Modernization Project is severely
needed for large scale events, which include drone proof
structures and drone ports among other critical security
enhancements," Ingle added.
Chief Justice John G. Roberts Jr.
issued an order Friday allowing the
Trump administration to continue ballroom work in the short term as
the Supreme Court weighs an emergency appeal in a lawsuit
challenging whether the construction requires the approval of
Congress.
A U.S. district judge and a federal appeals panel have both ordered
the administration to stop building the ballroom until lawmakers
authorize the project.
But the judges carved out an exception:
construction on national security needs, such
as a planned military complex underneath the ballroom, can
continue.
In August court filings supporting the White
House's case, Trump's top national security team urged the Supreme
Court to allow the project to proceed.
The construction, they said, comes as the
president faces rising threats from foreign adversaries and
terrorists, alongside advances in commercial drone technology that
could more effectively target White House grounds.
Trump officials argued the ballroom complex would provide essential
security upgrades to the president's residence and help guarantee
the U.S. government could continue functioning during a crisis.
White House Deputy Chief of Staff
Stephen Miller
wrote in his filing that the facility,
"serves continuity-of-government interests by
ensuring that the President and senior national security staff
are able to operate from a protected facility during any attack
on the nation's capital."
Army Secretary Dan Driscoll has repeatedly
asserted the ballroom's construction would help resolve an
"emergency" in the White House's "defensive posture" posed by the
spread of military-grade drones.
Driscoll told the Supreme Court in an Aug. 13 filing that completing
the ballroom complex was necessary so Trump could run the country in
a crisis.
"Securing this reinforced subterranean node
guarantees uninterrupted command and control in place".
Driscoll wrote, calling the project,
"a nondiscretionary prerequisite to ensure
the President can maintain continuity of government,
uninterrupted operations, and effectively exercise National
Command Authority during an attack or global crisis."
The arguments echoed the Trump
administration's increasing effort to
rely on national security as a way
to justify the ballroom's completion.
Trump has taken to calling the project a "military complex" in his
public comments and social media posts, and has repeatedly posted AI
renderings of drones, troops and even fuel tanker trucks stationed
on the future East Wing roof to press his case.
"The ballroom is so much a military component
with the drones and the bomb shelters," Trump told reporters on
the South Lawn on Wednesday.

Construction
continues
on the lower levels
of the ballroom in May.
(Chip Somodevilla/Getty
Images)
The White House has been
racing to complete the project
before any court-ordered halt takes effect.
Officials told the Supreme Court earlier this
month that construction was about "65% complete" and that about 250
workers are working 20 hours per day, seven days a week to quickly
finish it.
The structure goes five stories deep into the ground, and much of
the underground work has been completed, the administration said.
The project is already 70 feet above ground in some places,
officials told the Supreme Court.
After asserting in court last year that the secure portion of the
project could be carried out independently of the ballroom, the
administration has reversed its argument.
Maj. Gen. Garrett R. Hoffman, director of the White House
Military Office, told the Supreme Court that the aboveground
ballroom and belowground military facility are,
"inextricably intertwined elements" and that
the new construction "provides extraordinary protection to these
spaces that has not been available in the past."
Officials have also stressed that the concrete,
steel and other materials used for both parts of the project are
being chosen for national security reasons.
In court filings, they detailed how the
ballroom's construction materials are intended to stop bombs,
rockets, missiles and even nuclear blasts.
"It is, in a very large way, a 'safe room'
for the Presidency and the continuity of government," wrote
Joshua Fisher, a senior White House official who is managing
the project, in his Supreme Court filing.
The two former officials noted this same argument
had been invoked two decades ago to construct the White House's
existing subterranean bunker that is hardened against nuclear blasts
and other threats.
They questioned why the administration has
suggested that the White House lacks such a secure location,
including one that could help ensure a functioning government in
national security crises.
They also contrasted
secretive efforts to build the
existing bunker to the current project.
Details about the secure White House facility
are among the most closely guarded secrets in the U.S. government,
the former officials said, and its construction was concealed from
many lawmakers, administration officials and the public.
During the new ballroom's construction, Trump has repeatedly
revealed private aspects of the planned East Wing military complex,
such as its medical capabilities and "drone port."
And the renovation has occurred in public view,
potentially allowing foreign adversaries to spy once-hidden elements
of the White House complex - a threat Trump officials invoked in
their court filings to urge that construction continue.

The helipad and ballroom under
construction
at the White
House in Washington, D.C.
on August 20,
2026.
(Evan Vucci/Reuters)
Trump has separately accused the National
Trust for Historic Preservation, the organization that sued to
halt the ballroom's construction, of being "treasonists."
He has claimed that the nonprofit group, which
Congress charged with helping preserve historic buildings, was asked
not to file a lawsuit for national security reasons.
"I said the problem with the suit - I told
them this - is that we have many military things in this
ballroom, and ideally, they shouldn't be revealed," Trump said
in the Oval Office on Aug. 17.
"But now they are revealed, so the world
knows about it."
The National Trust's filings have not revealed
any new information about the ballroom project that Trump or the
administration did not previously disclose.
National Trust officials also told The Post that they were
never briefed on the bunker, that they were not asked by Trump or
the White House to not file a lawsuit, and that they sued to halt
the ballroom because they believe the president does not have the
authority to unilaterally make wholesale changes to the historic
White House grounds.
Trump officials did share classified information directly with U.S.
District Judge
Richard J. Leon as he weighed
the National Trust's arguments, beginning last year.
Leon ultimately ordered a halt to ballroom
construction but said the administration could keep working on
the underground military complex.
The White House's protections for presidents have
evolved as threats have increased.
For decades, the White House bunker was limited to a small facility
located in the basement of the East Wing, built during World War II
to help protect President Franklin D. Roosevelt in case of an
emergency.
That site - known as the Presidential
Emergency Operations Center, or PEOC - is where the Secret
Service hurried Vice President Dick Cheney and first lady
Laura Bush during
the 9/11 "terrorist" attacks.
The attacks of Sept. 11 prompted the White House to begin work on a
much more secure facility, said journalist Ronald Kessler,
who referenced construction of the bunker in his 2018 book, "The
Trump White House: Changing the Rules of the Game."
The upgraded facility, he wrote, was completed
during the Obama administration, had a months-long food
supply and was equipped with its own self-contained airflow system.
"It's a serious issue. What could be more
important than maintaining continuity of government?",
...said Kessler, who supports the Trump
administration's efforts to expand the White House's secure
facilities through the ballroom project.
Kessler and the former officials who spoke with The Post
acknowledged the necessity of providing the president with a secure
facility amid ongoing serious threats.
Trump has faced multiple assassination attempts,
the latest of which - from Iran earlier in the summer - prompted the
Secret Service to stage
an elaborate ruse that ended with
the president flying back from the NATO summit in Ankara
on a
separate aircraft, apart from Air Force One.
Still, the two former officials questioned the White House's public
case that the existing architecture is insufficiently hardened.
The existing site, the two people said, is
buried deep into the Washington bedrock, accessible by a private
elevator and built specifically to protect the president from a
vast array of threats, including an attack from a weapon of mass
destruction.
Its specifications, the former officials said, include many of
the safety protocols the White House is describing in an attempt
to justify the new ballroom complex.
The former officials also warned that the administration's
abrupt decision to demolish the East Wing, and expose what sat
underneath it, could have itself created national security
risks.
The
PEOC, two former officials
said, sat only about 20 feet under the East Wing and may have
been destroyed or damaged in the construction process.
Joshua Fisher, the White House
official managing the project, said that he was worried that halting
construction now could unwind nearly a year of work.
"Pausing work now, as the district court has
ordered, will jeopardize everything we have done so far," Fisher
told the Supreme Court.
"Depending on how long that freeze persists,
it might force us to tear down everything we have done as a
degraded mass, to allow for whatever comes next - something that
would be disruptive and extremely dangerous."
Similar arguments have not swayed lower-court
judges.
Leon, the district judge who first ordered the administration
in March to halt its ballroom construction,
chastised Trump officials
for arguing that they needed to complete the project for safety and
security reasons.
"Here is the bottom line," Leon wrote in a
follow-up ruling in April.
"Defendants themselves forged ahead and
created this 'coordinated and managed safety hazard' on White
House grounds."
|